For All Enquiries: 01454 294718

Welcome to Blastmaster

Gallery Categories

Gallery Categories

Before
COMPLETE FACTORY RENOVATION
Top Coat Finish
ON-SITE STRUCTURES
Staircase Protection
STEEL PROJECTS
2800 m2 2 coats in 2 days
2800M DISTRIBUTION CENTRE LONDON
Smaller Areas
PREPARATION DIAMOND GRIND
Dust Free Process
PREPARATION
Poured Mortar
PREPARATION REPAIRS
Epoxy Primer
COATING PRIMERS
Preparation of Existing Coatings
PREPARATION COMPLETE
Water Based 2 Coats
COATINGS WATER BASED
High Build Finish
COATINGS HIGH BUILD
Self Level
COATINGS SELF LEVEL
Laboratory
COATINGS SLIP RESISTANT
COATINGS CHEMICAL RESISTANT
COATINGS 6mm SCREEDS
Patch Primer Coat
SITE REFURBISHMENT
Intermediate Undercoat
STEEL PLATFORM
Even Finish
SITE OAK FRAMES
10mm Screed
PUMPED SCREEDS
RECENT PROJECTS