BLASTMASTER

Latest News

Oak Frames
01 December 2004 , Wed 13:06 After cleaning The client contracted a UK based traditional oak framing company to build his dream home in the French Alps. Our 10 years of ‘Sand Blast Cleaning’ green oak frames enabled us to advise and assist the client in choosing a French contractor suitable to blast clean ...

Service Area Floor
01 June 2003 , Sun 13:02  3mm self smooth finish This workshop floor was desperate for refurbishment and as nearly all the customers cars were Ferraris it was only fitting that our client chose a 3mm self smoothing epoxy resin system finished in Ferrari red. This was completed in 2 working days and after curing over ...

On Site Refurbishments
1 January 2004 , Thu 12:02 Trained Operatives In Situ expensive industrial equipment requires routine maintenance to ensure smooth operational running and help maximise and achieve its full cost effective working life, all the time complying with stringent health and safety requirements.Here a routine maintenance period ...